Built in March, 1964, as a standard S81 4-bunk design by NZFS's Ray Forsyth, D. Green & W. Johnson. The hut was lined at some point, & a small porch was added above the door in 2002. In 2004, DOC erected a new long drop toilet & replaced the clearlight in the roof. In 2021, DOC replaced the toilet door & lead head nails on the hut roof with hex screws. They cleared the helipad, increasing its size back to the original dimensions. DOC have continued cutting, poisoning & marking the route from the bushline at the top of the NZFS track, right to the hut. Edit Hut