Reputedly the first 12-bunk 'DOC designed' hut in NZ, it was built in 2004 to replace the old Long Harry Hut, which was at a different site [see 'Long Harry Hut (old)']. tails. The latter was shifted to Doughboy Bay in 2004 to replace the aging 'Doughboy Bay Biv'. March, 2021, saw the hut painted by a DOC ranger & 2 volunteers from the Winton Rotary Club & the chimney flue was replaced too. Edit Hut